Step 1: Establishing the Baseline

Establishing the Baseline
  • Choosing the Baseline: Select a side of your building to be the baseline. If aligning the building with an existing structure, roadway, or property lines, ensure this baseline is parallel to your chosen reference point.
  • Setting the Corner Stakes: Drive a stake (Stake A) at the starting corner of your baseline. Partially drive a nail into the top of Stake A as a reference point.

Step 2: Marking the Building Length

Marking the Building Length
  • Measuring and Marking: Using a tape measure, measure the desired building length along the baseline from Stake A. Drive a second stake (Stake B) at this point.
  • Leveling the Stakes: Ensure the tops of Stake A and Stake B are level using a construction level or transit. Drive a nail partially into the top of Stake B, marking the exact building length.

Step 3: Creating a Perpendicular End Wall

Creating a Perpendicular End Wall
  • Temporary Stakes: From Stake A, measure 12 feet along the baseline and drive a temporary stake. From this stake, measure 20 feet to find a point that is 16 feet from Stake A. This point will be perpendicular to the baseline. Drive a second temporary stake at this point.

Step 4: Marking Building Width and Setting Corner Stake D

Marking Building Width and Setting Corner Stake D
  • Marking the Width: Measure the desired outside building width along the perpendicular line established in Step 3, starting from Stake A. Drive Stake D at this point.
  • Leveling Stake D: Ensure Stake D is level with the tops of Stakes A and B. Partially drive a nail into the top of Stake D, marking the exact outside building width.

Step 5: Setting the Final Corner Stake

Setting the Final Corner Stake
  • Intersection Point: From the nail in Stake D, measure the outside building length. From the nail in Stake B, measure the outside building width. The point where these measurements intersect is the location for Stake C. Drive Stake C at this intersection.
  • Leveling Stake C: Ensure Stake C is level with the tops of the other stakes. Partially drive a nail into the top of Stake C at the exact outside corner point.

Step 6: Verification and Adjustments

Verification and Adjustments
  • Level Check: Before moving on, double-check that all four corner stake tops are level.
  • Measurement Verification: Verify the baseline length (A to B), widths (B-C and A-D), and final length (C-D). Adjust nails or stakes B, C, or D as needed. Do not move A or B.
  • Squaring with Diagonals: Measure the diagonals (AC and BD). For a rectangular building, these diagonals must be equal. Adjust by shifting stakes C and D along the rear wall line while keeping widths (B-C and A-D) equal. Recheck levels of any adjusted stakes.

Step 7: Installing Batter Boards

Installing Batter Boards
  • Placement: Drive batter board stakes 8 to 12 feet away from each corner. Position them to avoid interference with excavation, concrete deliveries, and construction activities. Batter boards should remain undisturbed until columns are backfilled.
  • Leveling and Attachment: Level and securely fasten the batter boards to the stakes at the same height as the corner stake tops.

Step 8: String Lines and Corner Marking

String Lines and Corner Marking
  • Stretching String Lines: Stretch building string lines between the batter boards, ensuring they barely touch the nails on the corner stake tops. Partially drive nails into the batter board tops to align the string lines.
  • Marking the Corners: The corners of the building will be located where the string lines intersect.
  • Removing Stakes: Once the string lines are in place, the temporary and corner stakes can be removed.

Why Squaring Matters?

Before we dive into the process, let’s understand why squaring a building is crucial. A square building ensures:

Easier Construction

A square foundation makes the rest of the construction process smoother, allowing for accurate framing, wall placement, and roof installation.

Structural Integrity

A square foundation evenly distributes weight, preventing uneven settling and potential structural issues in the future.

Aesthetic Appeal

A square building maintains visual symmetry and balance, enhancing its overall appearance.

Photo of author

Bruce Johnson

As a Residential Building & Design Consultant at BDC Building Design & Construction, I draw on years of expertise in delivering timeless, high-quality designs for remodeling projects across Milwaukee and beyond. With a foundation from the University of Wisconsin-Milwaukee, I bring a commitment to sustainable, efficient, and functional design solutions. Now based in Pensacola, Florida, I continue to offer expertise in innovative building and design. LinkedIn

Leave a Comment